港鐵招標北環綫第二期設計顧問
http://www.mtr.com.hk/ch/corporate/tenders/NOL_C1602.html合約編號:C1602
截標日期:1-2-2021
批出合約日期:預計2021年第三季
港鐵正邀請顧問公司詳細設計「北環綫第二期」,涉及新田、牛潭尾和凹頭新車站,全長約10.7公里,詳情瀏覽以下資料。
1.Background Information
1.1The Northern Link (NOL) is envisaged as a key transport infrastructure in the Northwest New Territories and New Territories North. The NOL will connect the Kam Sheung Road (KSR) Station on West Rail Line (WRL) and a new Kwu Tung (KTU) Station on East Rail Line (EAL), forming a loop in the northern New Territories. 1.2MTR Corporation Limited completed a technical study for NOL and submitted a project proposal to Government in 2017. The NOL comprises two phases. Phase 1 is a new KTU Station along the Lok Ma Chau Spur Line of EAL between Sheung Shui Station and Lok Ma Chau Station, and Phase 2 is a 10.7-kilometre new railway link which will connect a new station adjacent to the existing KSR Station on WRL with another new station adjacent to the KTU Station to be built under NOL Phase 1, together with three intermediate stations at San Tin, Ngau Tam Mei and Au Tau.Expressions of Interest are invited from suitably qualified combined multi-disciplinary consultants who have established or must establish an office in Hong Kong and have previous experience in railway design or feasibility studies, to carry out the design for NOL Phase 2. 1.3 It is anticipated that the design will be led by a civil and structural engineering consultant. 2.Scope of Services
The scope of preliminary design for NOL Phase 2 will include: (a) a multi-disciplinary technical study to develop, illustrate and complete the design of the railway scheme; (b) adoption of Building Information Modelling to develop the coordinated design and federated model, and to
prepare deliverables of the project; (c) preparation of programmes, project risk assessments and cost estimates;
(d) liaison with Government Departments and the relevant authorities to acquire all the necessary statutory
requirements and to prepare enquiry submissions; (e) preparation of the gazette plans; and (f) providing supports to public consultation.3. Tentative Key Dates
Consultancy Agreement No.Tender IssueTender ReturnConsultancy Award
C1602Q1/2021Q2/2021
Q3/2021
頁:
[1]