hkitalk.net 香港交通資訊網

 找回密碼
 會員申請加入


(B0)香港巴士車務及車廂設備 (B1)香港巴士廣告消息/廣告車行踪 (B2)香港巴士討論 [熱門] [精華] (B3)巴士攝影作品貼圖區 [熱門] [精華] (B3i)即拍即貼 -手機相&翻拍Mon相 (B4)兩岸三地巴士討論 [精華] (B5)外地巴士討論 [精華]

Advertisement


(B6)旅遊巴士及過境巴士 [精華] (B7)巴士特別所見 (B11)巴士精華區 (B22)巴士迷吹水區   (V)私家車,商用車,政府及特種車輛 [精華]
(A6)相片及短片分享/攝影技術 (A10)香港地方討論 [精華] (A11)消費著數及飲食資訊 (A16)建築物機電裝置及設備 (A19)問路專區 (N)其他討論題目  
(F1)交通路線建議 (C2)航空 [精華] (C3)海上交通及船隻 [精華] (D1)公共交通有關商品 [精華]   (Y)hkitalk.net會員福利部 (Z)站務資源中心
(R1)香港鐵路 [精華] (R2)香港電車 [精華] (R3)港外鐵路 [精華]   (O1)omsi討論區 (O2)omsi下載區 (O3)omsi教學及求助區
(M1)小型巴士綜合討論 (M2)小型巴士多媒體分享區 (M3)香港小型巴士字軌表        
 

Advertisement

 

hkitalk.net 香港交通資訊網»論壇 (B) Bus 巴士討論區 外地巴士討論 (B5) LDN; route 29- double decks return- a mix of old and ...
開啟左側

LDN; route 29- double decks return- a mix of old and new

[複製鏈接]
yblumann 發表於 2011-11-28 22:39 | 顯示全部樓層 |閱讀模式

                                    Advertisement



Route 29 reverted to double deck operation as of this Saturday.The contract to run the route is with Arriva, and the current contract will terminate next year.
The replacing contract [to run route 29 for 5 extendible to 7 years] is currently being tendered.

Therefore, Arriva- who run the contract now, negotiated with London Buses that the order for 33 new Wright integral buses[DWs]for route 243 would be used instead on route 29, and the 9 buses would be older - from fleet reserves [VLWs].

When the new contract starts in 2013, new buses would be specified; the new buses in use on route 29 would be transferred to route 243.

Is is complicated, but this is the cost of withdrawing the articulated buses early!

Here is new DW497, and existing and older VLW85 on route 29 shown in the fading winter sunny afternoon at Harrington Square.

Note: Prior to the arrival of articulated buses, the 29 was worked by DLAs, DLPs [i.e. Dafs with alx400 or Plaxton bodies] and VLWs.

regards

Yoram
29 dw497 har sq sun s.jpg
29 vwl85 har sq sun s.jpg
abh 發表於 2011-11-29 07:31 | 顯示全部樓層
Why are there shallower windows for staircase in 1st photo?
Anthony Luixxxxxxxxx xxx xxxxxxxx
blueblue 發表於 2011-11-29 15:16 | 顯示全部樓層
原帖由 abh 於 2011-11-29 07:31 發表
Why are there shallower windows for staircase in 1st photo?


for the placement of ventilation unit
中華民國.精彩一百
ML29 發表於 2011-11-29 20:04 | 顯示全部樓層

                                    Advertisement



It's weird to see a 9-year-old bus being deployed to a showcase central London route...
I hope the Bendis stay longer rather, though the B7TLs are not bad too.
We're part of The Go-Ahead Group
 樓主| yblumann 發表於 2011-11-30 03:53 | 顯示全部樓層
it's politics!
the mayor of London insisted that all articulated buses are withdrawn by the end of 2011, regardless of the costs.
Route 29 will be re-offered for tender, starting in 2013.
Naturally, the current operator- Arriva- will not buy new buses for the route,because they may well loose the route to another operator.

in the meanwhile, Wood Green- the garage operating the 29- is due to get new E400 tridents for routes 144 &221 in early 2012. One wonders if some of those new buses would not be used on the 29 instead...: Lol

regards

Yoram
samsam690 發表於 2011-12-5 16:29 | 顯示全部樓層
人在英, 心繫港 . 3ASV411 - KR6863
您需要登錄後才可以回帖 登錄 | 會員申請加入

本版積分規則

Advertisement

Advertisement

Advertisement

Advertisement

Advertisement

站規|清理本站Cookies|hkitalk.net 香港交通資訊網

GMT+8, 2025-5-1 13:33

Powered by Discuz! X3.4

Copyright © 2001-2020, Tencent Cloud.

快速回復 返回頂部 返回列表